New pours, full replacements, and driveway extensions built for West Jordan's clay soil and freeze-thaw winters. Most driveways done in 3-5 days.
The driveway is the biggest slab on your property and the first thing anyone sees. Here's how we build one that lasts 30 years instead of 12.
A driveway in West Jordan has a harder job than a driveway almost anywhere else in the country. It sits on expansive clay that swells and shrinks with every irrigation cycle, takes 100+ freeze-thaw cycles a winter, and absorbs road salt tracked home off Bangerter Highway and the Mountain View Corridor. Build it to a generic spec and it starts telling on you by year twelve.
We pour driveways for new builds that came with the builder minimum, full replacements on 1990s and 2000s homes across the 7800 South to 9000 South corridor, and extensions and widenings for families who outgrew a two-car approach. Same crew, same spec, every time.
Every residential driveway we pour in the valley is built to the same baseline, and we put it in writing on the estimate so you can compare bids line for line:
New construction. Builders in the west-side subdivisions pour the minimum the plat requires and leave the rest to you. We extend narrow approaches, add third-stall parking, and pour the RV pad the builder skipped — matching thickness and finish so it reads as one original pour.
Replacement. Full tear-out, haul-off, re-excavation and re-compaction of the base, then a fresh pour. If the old slab failed, the base is usually why — pouring new concrete on the old subgrade is how you buy the same problem twice.
Extension and widening. Adding 3-4 feet of width, a parking apron, or a side pad. We dowel into the existing slab where it makes sense so the two move together.
| Project | Typical Size | 2026 Installed Cost |
|---|---|---|
| Standard 2-car driveway, 4" broom finish | 600-800 sq ft | $5,000-$9,500 |
| 3-car or extended driveway, 4" broom finish | 900-1,200 sq ft | $8,000-$14,000 |
| Heavy-duty 5-6" pour (truck / RV rated) | any | add $1.50-$3.00 / sq ft |
| Tear-out and haul-off of existing slab | any | $2.00-$4.00 / sq ft |
| Driveway extension or widening | 150-400 sq ft | $1,800-$5,000 |
| Stamped or colored driveway upgrade | any | add $6-$12 / sq ft |
| Base repair where soil failed | as needed | $2-$4 / sq ft |
Ranges reflect what we actually quote in West Jordan and the surrounding valley in 2026. Site access, tear-out, and base condition move the number more than anything else — which is why every estimate is written after Bryan walks the property, not over the phone.
Bryan walks the property, scopes it honestly, and delivers a written quote — usually within 24 hours.
Request Your Free EstimateTell us about your project and we’ll get back to you with a detailed quote — usually within 24 hours. No pressure, no obligation.
West Jordan is home base. We work outward from there across the southwest Salt Lake Valley, and up into the north Utah County growth corridor.